Why 10% contingency is almost never enough
Contingency inherited from previous projects is one of the most frequent causes of cost overrun. What should replace it.
Request the articleTechnical notes
Short, technical material on estimating, contingency, benchmarking and sanction decisions. No marketing: content you can use in a project meeting.
Contingency inherited from previous projects is one of the most frequent causes of cost overrun. What should replace it.
Request the articleThe AACE International classification system, explained for those who must decide with that estimate in hand.
Request the articleWhy the gap between the two determines the accuracy of an estimate in the Andean mining belt.
Request the articleWhat a steering committee should require from the approval package, beyond the final number.
Request the articleDesign decisions that lower the initial investment and raise operating costs over the whole life of the asset.
Request the articleProductivity factors at sites above 3,000 metres and their effect on electromechanical erection.
Request the articleA 30-minute conversation is enough to define the scope of an SLLC review and its delivery time.