Turning numbers into certainty

How we work

Senior execution, stated method, traceable deliverable

The work structure is the same for a validation, a full estimate or a risk analysis. The depth changes; the rigour does not.

Sequence

How an engagement unfolds

  1. Engagement definition

    We agree in writing on the objective, scope, estimate class involved, deliverables, level of access to information and timeline. No ambiguity about what will be concluded and what will not.

  2. Confidentiality agreement

    Before receiving sensitive information, the confidentiality agreement is formalised and we verify there are no conflicts of interest with the parties involved.

  3. Data gathering and verification

    We request the base documentation — estimate, basis of estimate, quantities, quotations, schedule — and verify its integrity before analysing it. If critical information is missing, it is stated as a limitation and not filled in with assumptions.

  4. Independent analysis

    We apply the agreed method and test against the Spath Estimate Solution and AACE International standards. The analysis is led by the assigned team, under the responsibility of the partner in charge.

  5. Review with the project team

    We present preliminary findings before issuing the report. It is not a negotiation of conclusions: it is the opportunity to correct errors of fact.

  6. Report and recommendations

    We deliver the report with findings, recommended adjustments and their rationale. Each statement indicates its source and its level of confidence.

  7. Committee presentation

    We present the results to the appropriate body — project team, steering committee or board — and hand over the supporting file.

Senior execution

Engagements are led by professionals with proven experience in the asset type and in the stage the project has reached. The conclusion of an engagement is never delegated to junior analysts.

What we do not do

  • We do not perform detailed engineering
  • We do not supply equipment or materials
  • We do not build or manage construction
  • We do not accept engagements with a conflict of interest

This restriction is deliberate: it is what makes our opinion usable before an investment committee.

Engagement formats

  • One-off engagement with a defined deliverable
  • Review tied to an FEL gate
  • Support throughout the estimating cycle
  • Technical retainer for committee queries

Reference framework

Standards we apply

We do not invent methodology. We apply recognised standards and state which one was used in each deliverable, so that any third party can replicate the analysis.

AreaReferenceApplication in our engagements
Estimate classificationAACE International 18R-97Definition of Class 1 to 5 and the stated accuracy range
Basis of estimateAACE International 34R-05Structure and minimum content of the BOE document
Estimate validationAACE International 31R-03Scope and depth of the independent review
Contingency analysisAACE International 40R-08 / 65R-11Method for probabilistic contingency quantification
Project maturityFront-End Loading (FEL 1–3)Entry and exit criteria per gate
Risk managementISO 31000Framework for identifying and treating cost risks

Would your estimate survive an independent review?

A 30-minute conversation is enough to define the scope of an SLLC review and its delivery time.

Ask Us How