How we work
Senior execution, stated method, traceable deliverable
The work structure is the same for a validation, a full estimate or a risk analysis. The depth changes; the rigour does not.
Reference framework
Standards we apply
We do not invent methodology. We apply recognised standards and state which one was used in each deliverable, so that any third party can replicate the analysis.
| Area | Reference | Application in our engagements |
|---|---|---|
| Estimate classification | AACE International 18R-97 | Definition of Class 1 to 5 and the stated accuracy range |
| Basis of estimate | AACE International 34R-05 | Structure and minimum content of the BOE document |
| Estimate validation | AACE International 31R-03 | Scope and depth of the independent review |
| Contingency analysis | AACE International 40R-08 / 65R-11 | Method for probabilistic contingency quantification |
| Project maturity | Front-End Loading (FEL 1–3) | Entry and exit criteria per gate |
| Risk management | ISO 31000 | Framework for identifying and treating cost risks |