Turning numbers into certainty

Experience

More than 300 years of combined expertise

Eleven senior professionals whose careers were built inside the largest capital projects in Latin American mining — at Fluor, Bechtel, Worley, Aker and Amec, and on the owner's side.

11
Senior
professionals
300+
Years of combined
experience
26
Countries with
executed projects
10.0
USD billion — largest project
estimated or reviewed

Where the team comes from

Trained where major projects are built

Our experience was not gained advising from the outside. It was gained preparing the estimates and running the controls of those projects, from the inside.

The team was trained at the world's leading engineering and construction firms — Fluor, Bechtel, Worley, Aker Kvaerner, Amec Foster Wheeler, SNC-Lavalin, Ausenco, Jacobs, Hatch — and many of its members later held project controls positions on the owner's side.

That dual perspective is what allows us to anticipate where an estimate will break: we know how the number is built, and also which questions were never asked of it.

Team track record

  • Individual range: from 17 to more than 50 years of experience
  • Seven of the eleven exceed 30 years
  • AACE Class 1 to 5 estimates
  • Projects of up to USD 10 billion
  • Independent reviews for owners and lenders
  • Copper, gold, lithium, iron ore, nickel, potash and base metals

Clients

Where our team has worked

Operations and projects in which Spath Consulting professionals have taken part over their careers, in estimating, project controls or independent review.

  • CodelcoRadomiro Tomic · Chuquicamata Underground · Andina · El Teniente · Gaby · Ventanas
  • BHPEscondida · Spence · Cerro Colorado · Olympic Dam
  • TeckQuebrada Blanca 2 · Relincho · Zafranal · Galore Creek
  • Anglo AmericanQuellaveco · Los Bronces · Chagres
  • Antofagasta MineralsCentinela · Los Pelambres · Antucoya · El Tesoro · Encuentro
  • Freeport-McMoRanCerro Verde · El Abra · Candelaria
  • CollahuasiRosario · Ujina · Phase III · Complementary Water Source
  • BarrickPascua-Lama · Pueblo Viejo
  • NewmontConga · Yanacocha
  • GlencoreAntapaccay · El Morro · El Pachón
  • Rio TintoResolution Copper · Simandou · La Granja
  • ENAMIMatta Plant Expansion, Paipote

Capabilities

What the team does

Capital cost estimating

Class 1 to 5 estimates, bottom-up and parametric. Direct costs by discipline, indirect costs as a distinct specialty, take-offs, estimating plans and BOE documents.

Independent review

Expert review of third-party CAPEX, gate reviews and PEP chapter reviews, as well as third-party and lender's reviews for financial institutions assessing project financing.

Project controls

Cost control, change and trend management, forecasting by contract, cash flow, and progress, milestone and payment reporting.

Planning and scheduling

Primavera P6, master schedules and critical path, schedule risk analysis by Monte Carlo simulation, and start-up planning.

Risk and contingency

Statistical and parametric contingency analysis, probabilistic modelling with @Risk and PRISM, and normalisation of indirects and services.

Contracts and claims

Administration of EPC, EPCM and EP contracts, claims management and dispute resolution under FIDIC, and change order evaluation.

Engineering and project management

Engineering, studies and construction management; owner's representation; conceptual, PFS, feasibility and bankability studies; constructability.

Databases and benchmarking

Creation and maintenance of cost databases, project benchmarking, volatility protocols and corporate estimating standards.

Engagement types

What we are asked for most often

01

Validation ahead of an FEL 3 gate

The steering committee must sanction the project and needs an independent opinion on the accuracy of the Class 3 estimate and the sufficiency of the contingency.

Deliverable: validation report with findings and recommended adjustments.

02

Review for project financing

A financial institution is assessing lending against the project and requires an independent review of the CAPEX, the schedule and the controls organisation.

Deliverable: lender's review with opinion and risk matrix.

03

Second opinion on a disputed CAPEX

The estimate changed significantly between versions and the organisation has no satisfactory explanation for the delta.

Deliverable: reconciliation between versions and independent opinion.

04

Contingency challenged by the board

The proposed contingency rests on an inherited percentage and the board demands a quantitative basis.

Deliverable: probabilistic analysis with distribution curve and P50/P80.

05

Target cost before tendering

A reference is needed against which to evaluate bids for major construction and erection packages.

Deliverable: target cost per package with expected bid range.

06

Closure and liability valuation

The operation must estimate the cost of site closure and the provision for its environmental liabilities.

Deliverable: closure estimate and remediation schedule.

Confidentiality

Why we do not publish the details of each engagement

Most of our work takes place in sensitive contexts: unannounced investment decisions, pre-gate reviews or ongoing contractual disputes. Publishing the details would be incompatible with the work we are entrusted with.

On request, and with the express authorisation of the client concerned, we provide direct references and full CVs of the assigned team during a selection process.

Request credentials

Tell us the type of engagement, the project stage and the order of magnitude of the CAPEX, and we will send you the CVs of the team we would assign.

Request credentials

Would your estimate survive an independent review?

A 30-minute conversation is enough to define the scope of an SLLC review and its delivery time.